In the Republic of Ireland and Northern Ireland many of KEE’s projects have been using local M & E contractors who offer total supply and installation packages to clients, with fully comprehensive after sales support. Some of these projects include plant built for the following sites:
1. Large Hotel, Co. Wicklow.
The hotel already had a wastewater treatment plant but they decided to build a new 40-bedroom lodge on site and therefore needed a plant to treat all the existing flows plus the flow from the planned expansion. The main requirements of the client were:
The final effluent required Total Nitrogen and Phosphorus reduction and needed to consistently comply with the onerous discharge license of BOD < 20 mg/l, SS < 30 mg/l, COD < 80 mg/l, NH4-N < 20 mg/l, NO3-N (Nitrate Nitrogen) < 5 mg/l, Phosphate as PO4 < 12 mg/l, FOG (fat, oil and grease) < 20 mg/l and Detergent (MSAS) < 1 mg/l.
The plant was to have low operational and maintenance costs.
The plant supplier was to be able to provide complete service to include planned preventative and emergency maintenance, process and operation maintenance and effluent sampling.
The KEE’s proposal included supply, delivery, installation and commissioning of a 60m3 primary settlement tank, Module DC16 Rotating Biological Contactor and ST6 hopper bottom GRP final settlement tank. All this equipment was factory built and delivered to site ready for installation on concrete slabs.
This plant was installed and commissioned in 2003. It has operated extremely well mechanically and has delivered excellent process performance since start-up. The total electricity costs for the plant is less than EUR1,000 per annum.
2. Golf Club, Co. Cork
This was a design and build turnkey contract and KEE who were process partners in the project. The discharge license was direct to the watercourse and specified a BOD < 20 mg/l, SS < 30 mg/l, NH4-N < 20 mg/l & Phosphate as P < 2 mg/l.
KEE supplied their compact single piece NuDisc® Model 1200.
3. Golf Club, Co. Dublin
During the refurbishment of the clubhouse, on-site sewage treatment plant and disposal systems were required. The discharge license specified a BOD < 20 mg/l, SS < 30 mg/l & NH4-N < 10 mg/l, NO3-N (Nitrate Nitrogen) < 15 mg/l, Phosphate as PO4 < 5 mg/l and FOG (fat, oil and grease) < 10 mg/l.
KEE Process Ltd designed the process and supplied and installed a single-piece compact packaged plant NuDisc® F13N with inbuilt de-nitrification stage and phosphate removal stage.
This contract also included the design and installation of an inlet pumping station and a sub-surface percolation area.
4. County Council, Ireland
This was an installation for a municipal treatment works for a Southern Ireland County Council for 1000 PE. The flow to the works are combined with surface water and municipal wastewater with a discharge license for BOD < 20 mg/l and SS < 30 mg/l.
KEE supplied their packaged modular treatment system and the contractor led the contract for installation and commissioning.
For more information on our Wastewater Treatment Technologies, please phone on 01296 634500 or visit our KEE Process Website.