KEE NuDisc® 5000 ready for receiving flows (showing remote de-sludging ports)

KEE NuDisc® 5000 ready for receiving flows (showing remote de-sludging ports)

Brinkley upgrade using KEE NuDisc® Technology.

Brinkley upgrade

KEE Gravity 50S NuDisc® wastewater treatment plant built for Bromford in the small village of Woodmancote, Gloucestershire.

KEE NuDisc® wastewater treatment plant at Woodmancote

KEE extended NuDisc® 2000 RBC Installation for Spanish Village

KEE extended NuDisc® 2000 RBC Installation for Spanish Village

KEE Triton® – Mountmellick Wastewater Treatment Plant Upgrade

KEE Triton® – Mountmellick Wastewater Treatment Plant Upgrade

KEE collaborate with Northern Ireland Water

10 KEE RBCs at the new Keady Wastewater Treatment Works.

KEE uses ‘Fixed Film’ technology to meet Northern Ireland Waters’ discharge standards at Derrylin.

KEE uses ‘Fixed Film’ technology in Northern Ireland

Industrial Wastewater Disposal and Treatment Options

Back to Basics – A Practical Approach. Industrial Wastewater Disposal and Treatment Options

KEE Bio-Guard, the biological solution against fat, oils and grease

KEE Bio-Guard, the biological solution against fat, oils and grease

The KEE Services Team receive a new tanker

The KEE Services Team are now on the road serving their valued customers with the addition of their new tanker.

If you require KEE Services for any off-mains drainage enquiries, please contact the team on :  01296 634500
or email: sales@keeprocess.com

KEE Tankering leaflet


Water magazine portal information on the KEE Group

KEE Group Limited | Water Magazine

Made up of KEE Process & KEE Services Limited

Specialists in Domestic & Industrial Wastewater Treatment

Specialists in Domestic & Industrial Sewage Treatment Plants and Pump Stations

Specialists in servicing sewage treatment plants and pump stations

Check out the KEE profile on the UK Projects online portal

Specialists in Domestic & Industrial Wastewater Treatment

KEE-Waterprojectsonline 

plus our entry in the 2021 UK Projects publication.

Update of expired sewage treatment facility with a KEE Rotating Biological Contactor prevents pollution to River Dene

Delivery of KEE RBC.

KEE RBC replacing expired Sewage Treatment Facility under Section 101a of the Water Industry Act

The picturesque village of Walton is located within the heart of Warwickshire adjacent to the River Dene. The existing privately owned sewage treatment facility located on the bank of the River Dene was life expired and would often flood, resulting in pollution to the river. An application was made to Severn Trent under Section 101a of the Water Industry Act to provide a first-time sewage connection for all 20 properties in Walton village with a population of approximately 70 people. Due to the remote location of the village, a connection onto the existing Severn Trent sewer network, either gravity sewer or a pumped solution, was not deemed feasible. Therefore, the proposal was for the installation of a new rotating biological contactor (RBC) to replace the existing treatment facility.

Full project case study, click here

 

 

For KEE RBC information
click here

For more information on KEE technology and services please visit our website or call 01296 634500

Specialists in Domestic & Industrial Wastewater Treatment

KEE design and manufacture a gravity NuDisc® wastewater treatment plant to replace a decades old treatment system.

KEE 50S NuDisc gravity system

KEE’s solution was to provide a gravity system which incorporated all the clients wishes for ongoing operation and maintenance with enhanced Health and Safety features all within a smaller footprint than the existing treatment works.

Marc Goldby – Head of Home Investment at Bromford commented, KEE have been an integral partner in Bromford’s wastewater investment programme, consistently providing a first class service as highlighted by the project at Woodmancote, meeting all of our requirements and one both we and our customers can be confident in for years ahead.

 

 

 

 

 

For more information on KEE technology and services please visit our website or call 01296 634500

KEE Group certification

KEE is protecting the environment with two NEW wastewater treatment product ranges

For applications up to a population equivalent of 50

KEE NuPump

        click image to open leaflet


KEE NuPump:
This is a totally self-contained, covered, single piece packaged pump station fabricated in lightweight, corrosion-resistant and tough Tank Grade polyethylene, it is virtually silent and odour free.

The KEE NuPump is easy to install, with minimal site work and is suitable for small to medium flows of up to population equivalent of 50 in single-piece configuration.

Extremely low power demand and low maintenance costs, together with longevity ensure a lowest lifetime cost.

 

KEE NuFlow

click image to open leaflet


KEE Nu
Flow:

This is a totally self-contained, covered, single piece packaged treatment plant fabricated in moulded one-piece durable medium density polyethylene material, corrosion-resistant. it is silent and odour free.

The KEE NuFlow is easy to install, with minimal site work and is suitable for small to medium flows of up to population equivalent of 50 in single-piece configuration.

Mechanically reliable with no internal electrical or moving parts therefore low maintenance costs, together with longevity ensure a lowest lifetime cost.

 


For further details call 01296 634500
E: sales@keeprocess.com   W: www.keeprocess.com

KEE Group certification

Why you should choose KEE in 2021

Our specialist knowledge and expertise is derived from over 65 years’ experience in the development, design, manufacture, servicing, maintenance and operation of wastewater treatment systems and equipment. Many of our customers today have been working with KEE for over 30 years which is a testament to the trust, loyalty and value our customers have in us as a supplier.

Click here for more. . .

Contact us to discuss how we can help you on:
01296 634500, or visit our
website – www.keeservices.com

KEE Group made up of KEE Process Limited and KEE Services Limited

Happy Festive Season and a Prosperous New Year

KEE Festive opening hoursSpecialists in Domestic & Industrial Wastewater TreatmentClosing on 24th December, opening again on 4th January 2021.

Normal hours on 24th , 29th, 30th, & 31st December,
back to normal on 4th January 2021.

For managed contracts, please refer to your
account manager for out of hours service.

Full information on KEE services and process technology, is available on our WEBSITE

KEE Certification