The Solution
                  KEE met the main project driver by rationalising the treatment system from the existing 6 stage
                  system down to a 3 stage gravity treatment system, occupying just a third of the original site
                  footprint. KEE designed and manufactured bespoke extension skirts to each unit supplied, this
                  allowed the system to have the appropriate hydraulic profi le for it to operate under gravity.

                                                                          ®
                                                   The KEE 50S NuDisc Unit
                                                    l  In order for the covers to be handled by a single operative, KEE
                                                       undertook a brand new design to allow the covers to be lifted
                                                       and locked in place by 1 operative. A new metal framework
                                                       system was added to the covers allowing an operative to use
                                                       the framework handles as a lever and therefore easily lift the
                                                       covers on their own.






                                                    l  A bespoke locking system was supplied and attached to
                               SECURING PIN
                                                       the concrete surround of the unit allowing the covers to
                                                       be locked into place once opened by the site operative,
                                                       therefore negating any issue of the covers falling and
                                                       causing injury.

                      COVER LATCH BRACKETS & SECURING PIN

                                                    l  To allow plant bearings and motor gearbox maintenance at
                                                       ‘ground level’, KEE designed an staired extended entrance
                                                       section at each end of the unit allowing full engineer
                                                       access just above the pit fl oor (essentially a ‘new ground
                                                       level’).









                                                    l  To avoid any health and safety issues such as the stairs
                                                       becoming slippery, KEE designed and provided a bespoke
                                                       extended cover arrangement over the pit access to the
                                                       stairs. This extended cover set also incorporated the single
                                                       operative lift metal framework system on the covers.





                                                       For more information on KEE’s latest
                                                              ®
                                                       NuDisc RBC, please visit our website
                                                       or call KEE Process on:01296 634500









                                    Specialists in Domestic & Industrial Wastewater Treatment
                                    KEE Process Limited, College Road North, Aston Clinton, Aylesbury, Buckinghamshire HP22 5EZ, U.K.
                                    T: +44 (0)1296 634500  E: sales@keeprocess.com W: www.keeprocess.com
                                    KEE reserve the right to alter content without prior notice.  Produced on behalf of KEE by: www.connellmarketing.com
   1   2