CASE STUDY
®
KEE design and manufacture a gravity NuDisc wastewater
treatment plant to replace a decades old treatment system.
KEE’s solution was to provide a gravity system which incorporated all the clients
wishes for ongoing operation and maintenance with enhanced Health and Safety
features all within a smaller footprint than the existing treatment works.
“
Marc Goldby – Head of Home Investment at Bromford commented, KEE have been an
integral partner in Bromford’s wastewater investment programme, consistently providing
a first class service as highlighted by the project at Woodmancote, meeting all of our
requirements and one both we and our customers can be confident in for years ahead.”
Background The Challenge
KEE have been working with Bromford for many l A key driver for the project was Process
years supplying new wastewater treatment plants Rationalisation from the 1960’s 6 stage
as well as maintaining existing installations. treatment system with numerous levels
and infrastructure.
Bromford approached KEE to design, manufacture
and supply a new wastewater treatment system to l The plant needed to be operated and
replace an existing treatment plant that had been maintained by a single on-site operative.
built and running for decades at Woodmancote,
Gloucestershire. l The plant bearings and gearbox need to be
easily accessed for servicing at floor level
rather than having to service the items
within the pit at each end of the unit as is
standard design.
®
KEE Gravity 50S NuDisc wastewater
treatment plant built for Bromford in the small
village of Woodmancote, Gloucestershire.